Wednesday 1 January 2014

Last project which was project 8 we need to do a kind of performance with the theme of "Lost of Kingdoms". Some of the kingdoms are Srivijaya, Majapahit, Mataram, Pagaruyung, Langkasuka, Demak and Singhasari.

During Opening Ceremony:



Some photos during the night:













PROJECT 7 : XZbition Studio 104

For this time, we had to do an exhibition which follow each majors. So there were seven different exhibitions to be shown. The XZbition was held a week at 'the drum' of HBP. The theme was floating lines.







Some of the majors below:






During opening ceremony:



All best projects from project 1 to project 6 were shown during that time. 

Wednesday 27 November 2013

PROJECT 6: GROUPWORK

The project consist of 12 or 11 member for each group that combine every major in a group.
From here, each major has done their own speciallities scope of work. For building surveyor like me, I cooperated with major of Building Technology students for material suitable with the tophology and any other aspects to be taken care of.

Project 6 we had to make a stage which consist of 3 parts, 6A for reports, 6B for the presentations and 6C for the model.

For 6B, we used three A1 cartridge papers to present our amphitheathre concept. we used cocoon concept which has its speciality when it comes with the light.


the example of the concept



Here's the plan of the stage and its location detailing. 




These two are the perspectives drawing and its elevations.

For project 6C which is model making, here was the result:



PROJECT 5A AND 5B

This time, the time given for the project is 2 weeks compared to previous projects which only one week. we also need to do and submit them in A2 paper. The project is about making plan of a housing area which was given for us to choose.

I visited the Setia Green housing area which I found quite privacy. I went there in order to complete my project 5B that need to suggest addition for the safety, facilities and others.


project 5A


Project 5B: Suggestion

Tuesday 26 November 2013

PROJECT 4

The project was asked to create L-shaped chair with a table within or outside the chairs. the scale given was 1: 5 from original size.

A group of three was given which Dianna and Kamil were with me and we are from the same major, building surveying.

we presented the result on a paper A3 with the appropriate scale given.

From top


Front elevation


The design we used twisted concept which the seat design for this side was used as the body rest for the other side which we found interesting and unique.

PROJECT 3

This time we were given the project that reflect what are we from our sight to be showed in a piece of sculpture. there are so many creative and innovative sculpture being created since long time ago. So this what reflects myself.


so here was the draft.



these two types of elevation are the final result for the project given.

PROJECT 2A AND 2B

For this project we are told to draw natural structure for example the pattern of an old tree and a defoliation of leaves. Man-made structure is also the task which being given such as the bus stop and    a bridge. the project was told to draw on A3 paper.

For natural structure I decided to draw the pattern of the leaves of palma fan tree. i found that the structure is quite simple yet beautiful to be observed.


so after a week i've done my drawing.



While for project 2B, man-made structure i chose the stairs at Dewan Budaya near Dataran Bintang, USM.